About the Project
The County Highway S Phase 1 and Phase 2 projects are approximately 2.0 miles and 1.6 miles long, respectively.
The goal of the Project is to improve safety and capacity and reduce congestion by reconstructing the existing two-lane rural roadway into a four-lane divided roadway (expanded to the north), adding turn lanes, replacing traffic signals, improving drainage and adding bicycle and pedestrian accommodations with a multi-use path.
Work began in spring 2020 and was completed in late 2021.